Search...

Search

Pile Lifting Device PLD40T

Request for quotation

Request

Features Pile Lifting Device PLD40T

  • The PLD is mounted on the suppressor housing
  • The pile is connected to the PLD via a chain
  • The pile is lifted into the clamps by cylinders
  • Automatically clamp alignment
  • The PLD is suitable for a wide range of Vibratory Hammers
  • Even with very long pipe piles

Datasheet

About Pile Lifting Device PLD40T

Sequence:

  1. Hook up the pile while it is laying on the ground with shackles connected to a hole in the pile.
  2. Upend the pile to a vertical position.
  3. Lower the vibratory hammer onto the pile by sending out the cylinders.
  4. Clamp the clamps onto the pile
  5. Rise the PLD together with the vibratory hammer by retracting the cylinders. Chains/slings will lose its tension.
  6. Drive the pile into the soil.
  7. Unhook the pile.

 

Read more about our PLD

Alternative Products

Max. pile weight

Max. Vibratory Hammer weight

Max. pile diameter

Suitable piling profiles

Pile Lifting Device PLD40T

Max. pile weight34 t

Max. Vibratory Hammer weight6 t

Max. pile diameter1500 mm

PLD 100T

Pile Lifting Device PLD100T

Max. pile weight80 t

Max. Vibratory Hammer weight20 t

Max. pile diameter 2400 mm